Caveat emptor in property sales
The phrase ‘caveat emptor’ (or ‘buyer beware’) refers to the general principle that the seller of an item will generally know more about it than the purchaser and so the purchaser must take care to check the item before agreeing a price and purchasing it.
Whilst legislation such as the Sale of Goods Act and the Unfair Contract Terms Act provide some protection to consumers, allowing them to return goods that are not of an acceptable standard, it does not apply to the sale of property (although it may apply to new goods in a property).
The purchaser of property must take care to satisfy themselves that there are no unacceptable defects in the quality, fitness, or title of that property, as they may have no remedy against the seller if it turns out that there are defects. As a result, buyers will tend to investigate the title to a property they are considering purchasing, commission surveys and carry out searches to satisfy themselves that the property is acceptable.
Whilst the seller of property cannot make untrue statements or representations, they are under no obligation to disclose material facts to the purchaser. The only exception to this is if the seller is aware of latent defects in title or issues relating to the property, which the purchaser could not reasonably discover by inspection, then the seller must disclose those defects to the purchaser. Failure to do so can entitle the buyer to claim damages or to rescind the contract.
As it can be difficult to determine whether a defect is ‘obvious’ and so does not need to be disclosed, sellers may adopt a cautionary approach, however this can affect the price or the progress of the sale.
It is also important that the seller does not make statements or sign contracts that confirm they are not aware of any defects.
This combination of failure to disclose and misrepresentation can produce complicated situations. For example, a seller may not be obliged to disclose the extent of the title of a property, as this should be reasonably discoverable by the purchaser. However, if the property details falsely indicate the extent of the title then this may amount to misrepresentation.
The situation is complicated further by the existence of guarantees (which should be transferrable, but are only as good as the company that gave them), collateral warranties and third party rights which may give additional rights to the purchaser.
See also: Caveat.
[edit] Related articles on Designing Buildings
Featured articles and news
A safe energy transition – ECA launches a new Charter
Practical policy actions to speed up low carbon adoption while maintaining installation safety and competency.
Frank Duffy: Researcher and Practitioner
Reflections on achievements and relevance to the wider research and practice communities.
The 2026 Compliance Landscape: Fire doors
Why 'Business as Usual' is a Liability.
Cutting construction carbon footprint by caring for soil
Is construction neglecting one of the planet’s most powerful carbon stores and one of our greatest natural climate allies.
ARCHITECTURE: How's it progressing?
Archiblogger posing questions of a historical and contextual nature.
The roofscape of Hampstead Garden Suburb
Residents, architects and roofers need to understand detailing.
Homes, landlords. tenants and the new housing standards
What will it all mean?
The Architectural Technology podcast: Where it's AT
Catch-up on the latest episodes.
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.





















